Built To Suit

Don't fit into
a building.
Commission one.

When standing stock forces compromise — on height, floor load, automation or expansion — Built-to-Suit delivers a facility engineered around your operation, funded by a developer, leased on your terms.

The Nine-Stage Journey

From requirement
to running facility.

Stage 01 · Weeks 1–4

Requirement Discovery

Throughput, racking, automation, power, people — the operating brief that becomes the engineering brief.

Stage 02 · Weeks 3–10

Land Identification

Corridor shortlists with zoning, utility and connectivity certainty — sites the facility can actually be approved on.

Stage 03 · Weeks 8–14

Concept Design

Massing, docks, circulation and expansion phasing — signed off before detailed engineering spends a rupee.

Stage 04 · Weeks 12–20

Engineering

Structural, MEP, fire and floor-flatness specification to FM2 where the operation demands it.

Stage 05 · Parallel

Approvals

Building plans, fire NOC, environmental consents, MIDC permissions — sequenced so approvals never gate construction.

Stage 06 · Months 6–14

Construction

Developer-funded delivery with our monthly technical audits — quality, schedule and change-order discipline.

Stage 07 · Month 14–15

Commissioning

Load tests, dock calibration, fire systems, utility energisation — witnessed, documented, signed.

Stage 08 · Month 15

Handover

Snag-free possession against the original brief — the document we wrote together in week one.

Stage 09 · Ongoing

Operations Support

Annual lease reviews, expansion triggers, and a standing technical desk for the life of the tenancy.

Case Studies

Briefs we've already built.

Auto Components · Chakan
3,20,000 sq ft · 14 months

Press-shop-ready plant

12 m clear height, 8 T/sq m floor, 3,000 KVA and crane gantries — delivered on a 15-year lease with two expansion options.

E-Commerce · NCR
4,50,000 sq ft · 12 months

Automation-first fulfilment

ASRS-grade FM2 flooring, 15 m height, 60 docks and a mezzanine designed around the client's sortation OEM drawings.

Pharma · Hosur
1,10,000 sq ft · 13 months

GDP-compliant cold campus

Multi-chamber −25°C to +25°C envelope, 100% power redundancy and audit-ready documentation from day one.

Feasibility, Free

Bring the brief.
Leave with a plan.

A BTS feasibility session covers land options, indicative rents, timeline and developer appetite — before you commit to anything.

Book BTS Feasibility Session →