Press-shop-ready plant
12 m clear height, 8 T/sq m floor, 3,000 KVA and crane gantries — delivered on a 15-year lease with two expansion options.
Built To Suit
When standing stock forces compromise — on height, floor load, automation or expansion — Built-to-Suit delivers a facility engineered around your operation, funded by a developer, leased on your terms.
The Nine-Stage Journey
Throughput, racking, automation, power, people — the operating brief that becomes the engineering brief.
Corridor shortlists with zoning, utility and connectivity certainty — sites the facility can actually be approved on.
Massing, docks, circulation and expansion phasing — signed off before detailed engineering spends a rupee.
Structural, MEP, fire and floor-flatness specification to FM2 where the operation demands it.
Building plans, fire NOC, environmental consents, MIDC permissions — sequenced so approvals never gate construction.
Developer-funded delivery with our monthly technical audits — quality, schedule and change-order discipline.
Load tests, dock calibration, fire systems, utility energisation — witnessed, documented, signed.
Snag-free possession against the original brief — the document we wrote together in week one.
Annual lease reviews, expansion triggers, and a standing technical desk for the life of the tenancy.
Case Studies
12 m clear height, 8 T/sq m floor, 3,000 KVA and crane gantries — delivered on a 15-year lease with two expansion options.
ASRS-grade FM2 flooring, 15 m height, 60 docks and a mezzanine designed around the client's sortation OEM drawings.
Multi-chamber −25°C to +25°C envelope, 100% power redundancy and audit-ready documentation from day one.
Feasibility, Free
A BTS feasibility session covers land options, indicative rents, timeline and developer appetite — before you commit to anything.
Book BTS Feasibility Session →